Q-2, r. 17.1 - Regulation respecting the regulatory scheme applying to activities on the basis of their environmental impact

Full text
256. In addition to what is required by section 41, the declaration of compliance for an activity referred to in section 255 must include a declaration from a forest engineer attesting that the project is compliant with the conditions set out in that section and in the Water Withdrawal and Protection Regulation (chapter Q-2, r. 35.2).
Despite the first paragraph, in the case of an activity connected with a non-commercial fishing pond, a declaration from an engineer is not required.
O.C. 871-2020, s. 256.
In force: 2020-12-31
256. In addition to what is required by section 41, the declaration of compliance for an activity referred to in section 255 must include a declaration from a forest engineer attesting that the project is compliant with the conditions set out in that section and in the Water Withdrawal and Protection Regulation (chapter Q-2, r. 35.2).
Despite the first paragraph, in the case of an activity connected with a non-commercial fishing pond, a declaration from an engineer is not required.
O.C. 871-2020, s. 256.